Building the store room

 Marian and Maaike from Holland came to stay with us for most of this year
 and they took on the store room roof as a project.


We set out the vigas


gathered Caña from the river

laid the caña and cardboard

 and put a lime mix on top for the patio

M and M took a trip here and I built the shelves and window

 installed a door, made a bench outside
finished the interior


then they returned and installed themselves

In the autumn reinforcements arrived and we secured the bank below with a retaining wall


and the patio made a great place for yoga and acrobatics